
Assembly
15
Fig 39
4. Remove the washers/nuts from the remaining
three bolts and place aside, position the bolts along
the rail, put to hand four cap head screws (Q1) and
washers (Q2), see fi g 40.
5. Slot the three bolts in the fence rail (M) through
the three holes in the extension table (P), see fi g 41
lift up the table (P) and align the four holes to the
side with holes in the saw table and secure using cap
head screws/washers, see fi g 42-43.
Fig 40-41
Fig 42-43
6. Replace the three nuts/washers you removed
earlier from the fence rail (M) and lightly tighten, see
fi g 44.
Fig 44
M
Q1
Q2
P
Q1
Q2
M
7. Locate six cap head screws (Q1), nine washers (Q2),
three nuts (Q3), see fi g 45.
Fig 45
Q3
Q2 Q1
Continues Over...
Comentários a estes Manuais